Termite Control
Anti Termite control Dubai
Termites or white ants are not “Ants” at all. They are more resemble to cockroaches and develop from hundred to two hundred million years evolutionary history. Termites are small, white tan or black coloured insect belong order Isoptera. The Latin word Isoptera means equal wings and refers that front set of wings of reproductive termites is similar in size and shape to hind set.
Pre-construction anti-Termite Treatment
Termite Control is the first step to take if you are planning to build a house or commercial building. We use highly advanced techniques for treating the termite infestation. Creating a treated zone before the construction even begins, safeguards the building from future termite infestations. A direct injection of liquid pesticide is applied to eradicate termites completely from your premises. The different stages of our treatment include: The sides and bottom surface of the foundation trenches and pits are treated with chemicals to an appropriate height.Sides of all built-up walls that are in direct contact with the foundation, are also treated with chemicals. The chemicals are directed towards the masonry surfaces so that earth in contact with these surfaces is well treated with the chemical. Before laying the floor, the top surface is also treated with chemicals. We also advise builders to take appropriate care during construction to avoid creating untreated gaps later.
Post Construction anti-Termite Treatment
STAGE 1 : Treatment to wall and floor junction : Holes of 12mm diameter 18-20 inches apart will be drilled along the inner junction of wall and floor at depth of 6”on the entire ground and 4” on the first floor premises. Termiticide solution will be injected under pressure into these holes to create barrier against termites. If heavy infestation is noticed on 2nd and above floors the same treatment will be carried out on that particular floor.
STAGE 2 : Treatment to termite tubes : Visible shelter mud tubes are first sprayed, to control the existing movement of termites. The mud tube will be then removed and treatment will be given to the infested area.
STAGE 3 : Treatment along the external perimeter of the building: Trenching or drilling holes of 12mm diameter 12 inches apart along the external walls of the building at depth of 1ft. will be carried out to create a chemical barrier/killing field around the building. All the drilled holes will be sealed. If the building is on stilt,holes will be drilled only along the column side at ground level. If there is loose earth around the walls of the building, rodding will be done on every ft. adjacent to the external surfaces of the foundation wall upto a depth of 500 mm from the ground level. If building is surrounded by garden, the treatment shall be carried out to soil, which is in immediate contact with the building.
Discuss our services or request a cleaning estimate today
We will get back to you within 24 hours